V1 Veloway Bikeway

Steel Bridge Structures

Principal: Department of Transport and Main Roads

Principal Contractor: Queensland Bridge and Civil

Location: Brisbane, Queensland

Neumann Contractors have been awarded the steel fabrication contract for V1 Veloway Bikeway Stage D (Packages 2 & 4) by Queensland Bridge and Civil.

This portion of the V1 Veloway Bikeway Project is for a 135 metre long bridge structure over Juliette Street and a section of bikeway from Cornwall Street to O'Keefe Street.

The bridge structure will be fully fabricated in three 45 metre pieces in our Currumbin yard for delivery to Juliette Street, Greenslopes.

The V1, once completed, will run from Brisbane City to the Gateway Motorway off-ramp at Eight Mile Plains. The 17km connection will successfully provide the missing links within existing cycleway network and ensure a safe and dedicated commute for cyclists. The Veloway will also help promote an active and healthy lifestyle.

TMR Registered Steel Fabricator

Neumann Contractors - Steel Fabrication is a registered Level 3* Steel Fabricator for the Queensland - Department of Transport and Main Roads in the following areas:

  • Truss bridges,
  • Rolled steel girders,
  • Overhead fabricated gantries,
  • Traffic and balustrade rail,
  • Bridge throw screens,
  • Road side mounted sign gantries,
  • Bridge restraint angles,
  • Bearing attachment plates,
  • Traffic sign slip base poles,
  • Fabricated noise barrier posts,
  • Galvanised steel cover plates,
  • Gates,
  • and other miscellaneous steel fabrication.

Note Level 3 is the highest level of qualification - * Level 3 - A supplier who has consistently supplied product in accordance with the TMR specification for a period of 2 years.


Links: