Galvanised Bridge Rails for Davbridge Constructions

Posted on 19/06/15

Neumann Contractors have been contracted by Davbridge Constructions for the steel fabrication of 740 metres Bridge Traffic Rail and 370 metres of Balustrade for three bridges on their Lake Kawana Boulevard Project.

Steel fabrication is well underway and currently Neumann Contractors is getting ready for the first site delivery of 270 metres of Bridge Traffic Rail for the first bridge.

News