Proud to be part of the Neumann Group
Home Capability Safety Environmental Employment Community Contact
   

Infrastructure

Coombabah Water Future - OX38 Pump Station

Click images to Enlarge

The OX38 pump station and H2B pipeline are integral sections of the overall Coombabah Water Future Project in the Oxenford, Helensvale and Coombabah areas of the Gold Coast. The works included, the construction of a 5m diameter x 9m deep sewerage pump station and flow splitter chamber with odour control slab, a subsequent odour control slab and a Ø750 rising main and Ø375 recycled water main between the two structures. Other works included:

  • Excavation, bulk earthworks and roadworks
  • Structural concrete
  • Pipework and pump installation
  • Directional drilling and tunnel boring
  • Working from a barge