Tea Gardens
The Tea Gardens Vacuum pumping station project was commissioned by Mid Coast Water as part of their upgrade of the sewerage network in the Tea Gardens Area.
The Vacuum Pump Station is being constructed to receive flows from the new vacuum reticulation scheme of Myall Quays and Myall River Downs and to transfer these flows to the existing pump station for further transfer to the treatment plant. The station consisted of a reinforced concrete dry well and wet well, a reinforced concrete superstructure (including provision for a servicing crane), a galvanised structural steel roof and a concrete pavement access road.
The scope of work for the project included:
Structural Works
- Reinforced concrete structural works,
- Structural steel roof and fittings
Roadworks
- Concrete pavement
- Bulk earthworks including construction of an acoustic mound
- Stormwater drainage
Services
- 300 diameter sewer pressure mains
- Electrical and water installation

