Hot Acid Leach Reactor
A 12 meter long 47 tonne brick lined reactor barrel was manufactured for a Hot Acid Leach process at both the Mindarie and Goondicum Mineral Sands Projects. The project included fabrication and assembly of a hydraulic drive system.

